Almanca » İngilizce

Bauplatz“ kelimesinin çevirisi Almanca » İngilizce sözlüğünde (İngilizce » Almanca e atla)

Bau·platz ISIM eril

İnternetten örnekler (PONS yazı işleri tarafından onaylanmamıştır)

Baugeschichte

Die Arbeiten am künftigen Bauplatz begannen im Sommer 1868; bis zu 8 Meter anstehendes Gestein wurden abgetragen, um Platz für die Fundamente zu schaffen.

Im Juni 1869 war die neue Zufahrtsstraße fertig.

www.neuschwanstein.de

Building history

Work on the future building site began in the summer of 1868 with up to 8 metres of stone outcrop removed to make way for the foundations.

In June 1869 the new access road was completed.

www.neuschwanstein.de

Wohnbebauung Donaufelder Straße 73, Bombardier-Gründe, Wien 21

Der Bauplatz liegt am ehemaligen Werkareal der Firma Bombardier im 21. Bezirk…

20.08.2012 - 13:10 // Presse

www.fcp.at

Residential Area Donaufelder Straße 73, Bombardier-Gründe, 21st district of Vienna

The building site is situated on the former area of the company Bombardier in the 21st district of Vienna.…

21.08.2012 - 14:32 // Press

www.fcp.at

Wohnbebauung Donaufelder Straße 73, Bombardier-Gründe, Wien 21

Der Bauplatz liegt am ehemaligen Werkareal der Firma Bombardier im 21. Bezirk…Die Bebauung gliedert sich in zwei L-förmige Baukörper (BT1 - Straßenbaukörper, BT2 - Hofbaukörper);

die zweigeschoßige Tiefgarage (BT3) liegt zwischen diesen beiden Bauteile…

www.fcp.at

Residential Area Donaufelder Straße 73, Bombardier-Gründe, 21st district of Vienna

The building site is situated on the former area of the company Bombardier in the 21st district of Vienna.…The housing construction is divided into two L-shaped structures (BT1 – structure facing the street, BT2 – structure facing the courtyard);

the two-storey subterranean garage (BT3) is located between these two building parts…

www.fcp.at

Das Projekt konzentriert die notwendigen Serviceeinrichtungen der Interbank und besteht aus einem atenzentrum, Büros, Trainingseinrichtungen und einem Auditorium.

Der Entwurf ist vom Bauplatz – einer stillgelegten Kiesgrube – inspiriert.

Die Idee ist ein Campus als versunkener Garten, eingeschnitten in die urbane Struktur, wie eine Oase in der Stadt.

www.hollein.at

The project concentrates the corporate services of the Interbank and consists of a Data Center, offices, technical training facilities and an auditorium.

The design is inspired by the existing condition of the site—an old gravel pit.

The idea is a campus as a sunken garden, creating an urban oasis cut into the town pattern.

www.hollein.at

Das Grundstück liegt in einer herrlichen Position, man genießt den freien Blick auf das Ligurische Meer bei Imperia, auf Vasia, das Tal, das sich zum Monte Acquarone hinzieht sowie auf Ligurische Alpen und Seealpen.

Der Bauplatz ist nach Süd-Westen ausgerichtet und liegt inmitten ausgedehnter Olivenhaine.

Ausgebaute Zufahrt, Strom und Wasser ca. 100 m vom Grundstück entfernt.

www.casafortezza.de

The building site is located in a wonderful position, you can enjoy the view of the Ligurian Sea near Imperia, over the village of Vasia, the valley, which extends to the Monte Acquarone and over the Ligurian and French Alps.

The site is oriented to the south-west and is surrounded by extensive olive groves.

Good access road, electricity and water about 100 meters away from the property.

www.casafortezza.de

KAEFER-Leistungen Isolierung / Verblechung der Decken, Wände und Tanks, schwimmende Böden, Schallschutz, Rohrund Abgasisolierungen sowie Verkleidungen / Verblechungen, Montage der Galleys, der Proviant- Kühlräume inkl. Edelstahlregale sowie der Wand- und Deckenpaneele, Ausbau und Einrichtung aller Wohn- und Diensträume inkl. Montage der Möbel und Regale Herausforderung Da die Schiffe im Rhythmus von 50 Tagen gebaut werden, muss KAEFER stets vier Schiffe gleichzeitig in unterschiedlichen Bauzuständen bearbeiten.

Die Deckshäuser werden auf separaten Bauplätzen gebaut, phasenweise werden sogar drei zeitgleich bearbeitet.

Unsere Lösung Gutes Terminmanagement in enger Abstimmung mit allen beteiligten Gewerken, restpunktfreie Erledigung der Vertragsaufgaben, flexible Reaktionen auf alle Situationen Mehrwert für den Kunden Umfassende KAEFER-Erfahrung, da bereits auf 22 Schiffen dieses Typs tätig.

www.kaefer.com

KAEFER services Insulation / Sheathing of ceilings, walls and tanks, floating floors, noise protection, insulation of pipes and flues as well as sheathing and jacketing, installation of galleys and refrigerated rooms incl. stainless steel shelving, installation of wall and ceiling panels, finishing and fitting of all living and working areas incl. installation of furniture and shelves Challenges As the vessels are built in a 50-day interval, KAEFER has to work on four vessels simultaneously, even though they are at different stages of construction.

The deckhouses are built at separate building sites, sometimes three at the same time.

Our Solution Precise scheduling in close collaboration with all the contractors involved, accomplishing the job thoroughly and reacting flexibly to all kinds of challenges Benefit for the Customer KAEFER has a great deal of experience with this type of ship, as it has already worked customer on 22 of them.

www.kaefer.com

nicht gebaut werden darf.

Aber auch in den bebauten Bereichen der Insel, kann nur dort ein Restaurant erbaut werden, wo Bauplatz mit der erforderlichen Infrastruktur zur Verfügung steht.

Das bedeutet, es wurde vorher eine Auswahl möglicher Standorte neuer Restaurants getroffen und die besten Standorte müssen aus dieser Menge ausgesucht werden.

optimierung.mathematik.uni-kl.de

prohibited.

Even in areas where they are allowed to build a restaurant, they can only chose a building site where the necessary infrastructure is available.

Therefore a pre-selection of possible locations for new restaurants was made and the ideal locations have to be chosen from this set.

optimierung.mathematik.uni-kl.de

Im Internet findet man dieses und weitere Projekte von M. Brausem unter www.passiv-haus.de.

Die Passivhaus-Siedlung in Wiesbaden erlaubte den unmittelbaren Vergleich von Messergebnissen aus 22 Passivhäusern mit den von 24 Niedrig-Energie-Häusern am gleichen Bauplatz, durchgeführt durch das Institut Wohnen und Umwelt (IWU, Darmstadt).

Folkmar Rasch hat diese Siedlung geplant und 1997 realisiert.

www.passivhaustagung.de

More information on this and other projects of M. Brausem available on the Internet at www.passiv-haus.de.

The estate of Passive Houses in Wiesbaden made it possible to compare 22 Passive houses to 24 low-energy buildings on the same building site; a survey carried out by the Institut for housing and environment, Darmstadt (IWU).

Folkmar Rasch had planned the estate which was realised in 1997.

www.passivhaustagung.de

Risikoanalysen und Qualitätssicherungspläne für Baustandorte :

wir helfen Ihnen in der Planungsphase bei der Suche und Beurteilung des richtigen Bauplatzes.

Risikoanalyse, Qualitätssicherungsplan, Bauwesen, Baudynamik, Erdbebensicherung, Hochwasserschutz, Entwässerung, Baugrundverformung, Bauvorhaben, Planungsphase, Planungsberatung, Altlasten, Nachbarbebauuung, Bauzeitoptimierung, Bautechnik, Bauplatz

www.tuv.com

Risk assessments and quality assurance plans for construction projects :

In the planning phase, we can help you look for and assess the right building site.

Risk Assessment, Quality Assurance Plan, Construction, Building Dynamics, Seismic Protection, Flood Protection, Drainage, Subsurface Deformation, Construction Project, Planning Phase, Planning Consultation, Polluted Areas, Neighboring Development

www.tuv.com

Bir kelime, bir kelime grubu veya bir çeviri mi eklemek istiyorsunuz?

Bize yeni bir kelime gönderebilir.

"Bauplatz" tek dilli Almanca sözlüklerinde


Sayfayı aç Deutsch | Български | Ελληνικά | English | Español | Français | Italiano | Polski | Português | Русский | Slovenščina | Srpski | Türkçe | 中文